Chandrayaan-3 Likely To Be Launched On July 12, Will Contain Only Lander And Rover
The mission objective of Chandrayaan-3, as mentioned on the ISRO official website, is to have a safe and soft landing on the moon, followed by a rover to conduct the in-situ experiments on the moon.
After the failure of Chandrayaan-2 in 2019, the Indian Space Research Organisation ( ISRO) is all set to launch its follow-up mission Chandrayaan-3 to reach the dark surface of the moon. Reports are suggesting that it is expected to take off on July 12 by Launch Vehicle Mark-II or LVM3 from Satish Dhawan Space Centre, Sriharikota.
Earlier in May, a senior official of the Bangalore-headquartered national space agency under the Department of Space as saying, “Chandrayaan-3 mission is scheduled in July second wee.,”
Unlike the previous mission, this time ISRO will launch the Lander and Rover unit with Chandrayaan-3, with an aim to repurpose the orbiter of Chandrayaan-2 for this lunar mission. One of the main objectives of ISRO this time will be to have a stable landing on the moon.
Chandrayaan-3 includes an indigenous Lander module (LM), Propulsion module (PM), and Rover. The Lander will be able to soft-land at a chosen location on the moon and release the Rover, which will conduct in-situ chemical analysis of the lunar surface while it is moving. There are scientific payloads on the Lander and the Rover that will conduct lunar surface tests.
The propulsion module, which will be deployed once the launch vehicle is injected, will hold the lander and rover securely until they reach the final 100 km lunar polar orbit before separating.
The mission objective of Chandrayaan-3, as mentioned on the ISRO official website, is to have a safe and soft landing on the moon, followed by a rover to conduct the in-situ experiments on the moon. According to ISRO Chief S Somnath, a lot of work is being done to achieve that, including building new instruments, building better algorithms, and taking care of the failure modes.
Earlier in February, the flight acceptance hot test of the CE-20 cryogenic engine, which will power the Cryogenic Upper Stage of the launch vehicle LVM3 for the Chandrayaan-3 mission, was successfully completed by ISRO. It was conducted at the ISRO Propulsion Complex, Mahendragiri, Tamil Nadu.
The Chandrayaan-2 mission was unsuccessful due to a last-minute software glitch. The Vikram Lander’s guiding software malfunctioned and caused it to crash down on the moon’s surface.
@media only screen and (min-width: 480px){.stickyads_Mobile_Only{display:none}}@media only screen and (max-width: 480px){.stickyads_Mobile_Only{position:fixed;left:0;bottom:0;width:100%;text-align:center;z-index:999999;display:flex;justify-content:center;background-color:rgba(0,0,0,0.1)}}.stickyads_Mobile_Only .btn_Mobile_Only{position:absolute;top:10px;left:10px;transform:translate(-50%, -50%);-ms-transform:translate(-50%, -50%);background-color:#555;color:white;font-size:16px;border:none;cursor:pointer;border-radius:25px;text-align:center}.stickyads_Mobile_Only .btn_Mobile_Only:hover{background-color:red}.stickyads{display:none}
- SEO Powered Content & PR Distribution. Get Amplified Today.
- PlatoAiStream. Web3 Data Intelligence. Knowledge Amplified. Access Here.
- Minting the Future w Adryenn Ashley. Access Here.
- Buy and Sell Shares in PRE-IPO Companies with PREIPO®. Access Here.
- Source: https://www.indiandefensenews.in/2023/05/chandrayaan-3-likely-to-be-launched-on.html
- :is
- 1
- 100
- 12
- 2019
- 27
- a
- Able
- Absolute
- acceptance
- According
- Achieve
- agency
- aim
- algorithms
- All
- an
- analysis
- and
- ARE
- AS
- At
- BE
- before
- being
- Better
- border
- both
- Bottom
- Building
- by
- care
- caused
- Center
- centre
- chemical
- chief
- chosen
- clear
- color
- Completed
- complex
- Conduct
- conducted
- Crash
- cryogenic
- Dark
- defence
- Department
- deployed
- Display
- done
- down
- due
- Engine
- expected
- experiments
- Failure
- February
- final
- fixed
- flight
- followed
- For
- from
- glitch
- Have
- hold
- HOT
- HTML
- http
- HTTPS
- in
- includes
- Including
- Indian
- instruments
- ISRO
- IT
- ITS
- jpg
- July
- landing
- launch
- launched
- left
- likely
- location
- Lot
- Lunar
- Main
- max-width
- May..
- mentioned
- Mission
- modes
- module
- Moon
- moving
- name
- National
- New
- next
- objective
- objectives
- of
- off
- official
- Official Website
- on
- once
- ONE
- only
- or
- Orbit
- organisation
- PHP
- plato
- Plato Data Intelligence
- PlatoData
- polar
- power
- previous
- propulsion
- reach
- release
- Reports
- research
- rover
- s
- safe
- saying
- scheduled
- Screen
- Second
- securely
- senior
- separating
- set
- Soft
- Software
- Space
- stable
- Stage
- Successfully
- Surface
- Take
- taking
- test
- tests
- that
- The
- There.
- they
- this
- time
- to
- top
- Transform
- true
- under
- unit
- until
- vehicle
- was
- Website
- which
- while
- white
- will
- with
- Work
- z-index
- zephyrnet
More from Indian Defense News
ISRO To Continue Lunar Mission Till An Indian Lands On The Moon: Somanath
Source Node: 2548876
Time Stamp: Apr 17, 2024
AMCA Finishes Systems-Level Critical Design Review: Janes
Source Node: 1961849
Time Stamp: Feb 16, 2023
Rafale To Exercise Garuda, A Look At Indo-French Defence Ties As Chief of Defence Staff Visits France
Source Node: 2558818
Time Stamp: Apr 26, 2024
‘India Imitating Israel In Kashmir’: Al-Qaeda Breathes Fire Over India’s Stand On Hamas Attacks
Source Node: 2383202
Time Stamp: Nov 15, 2023
Theatre Commands Will Catapult Indian Armed Forces Into Next Orbit: CDS Gen Anil Chauhan
Source Node: 2580215
Time Stamp: May 22, 2024
IAF Dhruv Helicopters Fixed After Design Issue, Fitted With Upgraded Control System
Source Node: 2335419
Time Stamp: Oct 19, 2023
India To Acquire 97 ‘Made-In-India’ Drones For Over Rs 10,000 Crore To Keep An Eye On China, Pak Borders
Source Node: 2176080
Time Stamp: Jul 18, 2023
IAF Cuts Capital Expenditure For Procurement By Rs. 26,000 Crores On Russia Defence Supply Delays
Source Node: 2029660
Time Stamp: Mar 25, 2023
India Crosses T-72 With T-90 To Create Deadly Hybrid Tank
Source Node: 1917538
Time Stamp: Jan 25, 2023
India’s First Space Station Unit Is Just 4 Years Ahead: ISRO Chief S Somanath
Source Node: 2499211
Time Stamp: Feb 28, 2024
China Helping Pak Army Build Defence Infrastructure Along LoC: Officials
Source Node: 2147774
Time Stamp: Jun 26, 2023