26 March 2024
by Gareth Jennings
Aircraft BK35 seen at RAF Marham shortly after its arrival on 20 March. With deliveries to the UK of TR-2 standard aircraft now complete, the arrival of TR-3 standard aircraft should commence later in the year. (Crown Copyright)
The UK has received its final Lockheed Martin F-35B Lightning combat aircraft to be delivered at the Technology Refresh-2 (TR-2) standard, the manufacturer confirmed to Janes on 25 March.
The Ministry of Defence (MoD) announced the arrival of the two jets on 20 March. Lockheed Martin told Janes that BK (the factory code given to UK aircraft) 34 and BK35 are the last TR-2 jets for the UK, ahead of the delayed commencement of TR-3 deliveries to the wider international programme later in 2024.
- SEO Powered Content & PR Distribution. Get Amplified Today.
- PlatoData.Network Vertical Generative Ai. Empower Yourself. Access Here.
- PlatoAiStream. Web3 Intelligence. Knowledge Amplified. Access Here.
- PlatoESG. Carbon, CleanTech, Energy, Environment, Solar, Waste Management. Access Here.
- PlatoHealth. Biotech and Clinical Trials Intelligence. Access Here.
- Source: https://www.janes.com/defence-news/uk-receives-final-tr-2-standard-f-35s
- :has
- 19
- 20
- 2024
- 25
- 34
- a
- After
- ahead
- aircraft
- already
- and
- announced
- ARE
- arrival
- article
- At
- BE
- by
- code
- combat
- commence
- commencement
- complete
- CONFIRMED
- copyright
- Crown
- defence
- Delayed
- delivered
- Deliveries
- factory
- final
- For
- full
- get
- given
- HTTPS
- in
- International
- invisible
- ITS
- Jets
- jpeg
- jpg
- Keep
- Last
- later
- lightning
- Lockheed Martin
- Manufacturer
- March
- Martin
- ministry
- now
- of
- on
- plato
- Plato Data Intelligence
- PlatoData
- programme
- Reading
- received
- receives
- seen
- Shortly
- should
- small
- standard
- subscriber
- Technology
- that
- The
- the UK
- to
- told
- two
- Uk
- wider
- with
- year
- zephyrnet